How can we help you today?
Plan Submission and Broadband Certification for Landed Houses
Owners/developers are required to submit 2 sets of architectural drawings (1 set to be returned upon StarHub's approval) showing the Lead-in Pipe (LIP) from gatepost to roadside drain and pipe from gatepost to unit as shown in the connection to StarHub's lead-in pipe illustration on this site.
In addition, all required cable (TV) points must be indicated on the architectural drawing.
The Plans are to be sent to:
Manager
Network Programmes Office
67 Ubi Avenue 1
#03-01 StarHub Green
Singapore 408942
Certification For Broadband Coaxial Cable Readiness
Owners/developers requesting this certification for the purpose of TOP/CSC are advised to write to:
Manager
Broadband Cable Transmission
67 Ubi Avenue 1
#03-01 StarHub Green
Singapore 408942
Tel: 6725 1721; Fax: 6820 6008
Email: crc@starhub.com
Please contact StarHub's Public Hotline at 6873 2828 if you intend to renovate or rebuild your home to ensure all necessary provisions are made during construction.