Owner/developer are required to submit 2 sets of architectural drawings (1 set to be returned upon StarHub's approval) showing the Lead-in Pipe (LIP) from gatepost to roadside drain and pipe from gatepost to unit as shown in the connection to StarHub's lead-in pipe illustration on this site.
In addition, all required cable (TV) points must be indicated on the architectural drawing.
The Plans are to be sent to:
Owner/developer requesting this certification for the purpose of TOP/CSC are advised to write to:
Please contact StarHub's Public Hotline at 6873 2828 if you intend to renovate or rebuild your home to ensure all necessary provisions are made during construction.